A 2.71 Acre luxurious estate that boasts 5 main house bedrooms and 7.4 bathrooms. The property has been meticulously designed and crafted to the highest standards, with exquisite attention to detail evident throughout. Home is currently Under Construction. Until Dec 2023 - Possible finish changes. Can be delivered as a shell with an assignable builder contract, design package (Q4 2023 Delivery for those who wish to make significant design finish changes) or delivered complete with C/O (Q2 2024),
, TIERRA DEL-REY SOUTH LT 9 & E 1/2 OF ABNDED CAIN BLVD LYG W OF & ADJ THERETO